Our method, visit after visit.

Same spot, same angle, every visit. Month after month, you watch your villa rise as if you were standing there.

No WhatsApp? Write to us by email. yalinproperties@gmail.com

A visit, step by step

  1. Before the visit

    We confirm access and the date with the developer, only for logistics. We reread the points observed last time.

  2. On site

    Photos from the same fixed angles, one video, dated findings, workers and trades counted.

  3. Before a payment call

    We check the stage required by your contract: "stage reached: yes / no" with photos of the stage.

  4. After the visit

    Your report by WhatsApp and/or email, the full gallery on Google Drive in original quality.

The grid of fixed angles

Each photo is taken from the same spot at every visit. Put them side by side and the build moves forward under your eyes. Each photo has a short caption: "South façade", "Bathroom bedroom 1", "Upper floor slab rebar".

Example

Foundations: footings and ground beams, compared with the plans you send us.

Stage reached: yes

The three reports compared

A building technician's visual findings and simple measurements. Not an engineer's assessment or calculation, not legal advice.

Essential

  • Photo reports1 a month
  • Captioned photos, same angles, one video
  • Before each payment callVisit + photos
  • Site status: dated progress, workers, points observed : No
  • Full monthly file (PDF), works explained in detail : No
  • Checks at critical stages (pours, networks, waterproofing, pool)Option
  • Compliance with the permit plans : No
  • Videos of electrical and plumbing networksOption
  • Choice of finishesOption
  • Questions ready to send to your developer : No
  • Handover, snag list and full inventoryOption
  • Keys collected on your behalfOption
  • Villa logbook and time-lapse : No
  • Link to the full photo gallery (Google Drive)

Follow

  • Photo reports2 a month
  • Captioned photos, same angles, one video
  • Before each payment callVisit + written check
  • Site status: dated progress, workers, points observedMonthly
  • Full monthly file (PDF), works explained in detail : No
  • Checks at critical stages (pours, networks, waterproofing, pool)Option
  • Compliance with the permit plans : No
  • Videos of electrical and plumbing networksOption
  • Choice of finishesOption
  • Questions ready to send to your developer : No
  • Handover, snag list and full inventoryOption
  • Keys collected on your behalfOption
  • Villa logbook and time-lapse : No
  • Link to the full photo gallery (Google Drive)

Premium

  • Photo reports3 a month
  • Captioned photos, same angles, one video
  • Before each payment callVisit + written check + live video call
  • Site status: dated progress, workers, points observedMonthly, trade by trade
  • Full monthly file (PDF), works explained in detail
  • Checks at critical stages (pours, networks, waterproofing, pool)Included
  • Compliance with the permit plansIncluded
  • Videos of electrical and plumbing networksIncluded
  • Choice of finishesIncluded: 2 h
  • Questions ready to send to your developer
  • Handover, snag list and full inventoryIncluded
  • Keys collected on your behalfIncluded
  • Villa logbook and time-lapseAt delivery
  • Link to the full photo gallery (Google Drive)

The photo report, every plan

  • Date and time of the visit
  • Photos from the same angles, their number depends on the size of the villa and the progress of the build
  • A short caption under each photo
  • 1 video of the site
  • If there is a payment call: "stage reached: yes / no" and photos of the stage

The site status, Follow

  • Progress of works on the day of the visit: "At 12/03: foundations completed"
  • Number of workers present and trades
  • Next payment call: stage required by the contract and our finding
  • Points observed (good points and defects), followed from one month to the next: "still visible" or "no longer visible"

The full monthly file, Premium

  1. Cover page

    Client, villa, file number, month covered, visit dates, delivery date in the contract.

  2. Summary of the month

    A few lines, no colour code and no opinion.

  3. Progress trade by trade

    Dated facts, trade by trade.

  4. Works of the month in detail

    The main part: what was done during the month, explained precisely, with photos compared between the 3 visits and with the month before.

  5. Checks at critical stages

    Concrete pours (rebar compared with the plans provided), electricity and plumbing before closing, waterproofing, pool before tiling. Findings, measures and photos.

  6. Compliance with the plans

    Dimensions, room positions, openings and networks against the permit plans. Significant gaps reported with a photo and an indicative measure.

  7. Site activity

    For each visit: date, workers, weather, trades present.

  8. Points observed

    What was seen and deserves to be reported, with photo and date, followed at the next visits.

  9. Questions for your developer

    Written in English, ready to copy and paste. We do not send them ourselves.

  10. Payment calls

    Next stage required by the contract and our finding. Summary of the previous calls.

  11. Materials seen on site

    Brands and references seen during the month.

  12. Photos and videos

    Link to the full gallery, network videos when they are made.

  13. Limits of the file

    A building technician's visual findings and simple measurements; the developer remains solely responsible for construction and delays; the decision to pay is yours.

The villa logbook, Premium, at delivery

Yours for life: useful for maintenance, future works and resale.

  • A chronological summary of all the monthly files
  • Videos of the electrical and plumbing networks before the walls closed
  • Photos of foundations, rebar and buried networks
  • List of materials, brands and references installed
  • Handover, snag list and snag clearance
  • Manuals and documents handed over by the developer
  • Time-lapse video of the build