Will your villa match the plans? Someone needs to go and see.

On handover day, we check your villa room by room and send you the snag list with photos the same day. Then we come back within 60 days.

No WhatsApp? Write to us by email. yalinproperties@gmail.com

When to call us

  • Your villa is delivered in a few months and you will not be on site
  • You want to sign the handover with a list of what must be fixed
  • You bought furnished and want a full inventory
  • You want the keys collected on your behalf, with your written power of attorney

What we check on handover day

A building technician's visual findings and simple measurements. Not an engineer's assessment or calculation, not legal advice.

Before the day

  • Description, signed finishes, developer inventory and permit plans collected
  • Points still visible in the site reports reread
  • Date and time confirmed with the developer and with you

Documents from the developer

  • Manuals of the equipment
  • Plans, as built if possible
  • Water and electricity meter numbers
  • Water, electricity and internet contracts or steps

Outside and structure

  • Façade and render: cracks, finish
  • Roof, gutters, downpipes
  • Terraces and balconies: slopes, water drainage
  • Railings solid
  • Driveway, paths, parking
  • Gate, fence, boundary walls
  • Outdoor lighting
  • Signs of leaks or damp

Room by room

  • Dimensions, positions and openings against the permit plans
  • Walls, paint, ceilings
  • Floors and tiles: level, joints, hollow tiles
  • Doors and locks
  • Windows, bay windows, mosquito screens
  • Every socket tested
  • Switches and lights
  • Air conditioning
  • Cracks and damp

Electricity

  • Board: breakers labelled
  • RCD: test button works
  • Earth present
  • All indoor and outdoor sockets
  • All lights
  • Water heater
  • Electricity meter reading

Plumbing and water

  • Pressure at every tap
  • Hot water at every point
  • No leaks under sinks and basins
  • Toilet flushes
  • Showers: fast drainage, no standing water
  • Floor drains
  • Pump and water tank
  • Water meter reading

Kitchen and bathrooms

  • Units, drawers, hinges
  • Worktop and sink watertight
  • Appliances: hob, oven, hood, fridge
  • Silicone joints complete
  • Mirrors, accessories, glass screens fixed
  • Ventilation and extractors

Air conditioning

  • Each unit cools
  • Condensate drains outside
  • Remote controls present

Pool

  • Pump and filtration running
  • Pool lighting
  • Tiles and coping: cracks, loose tiles
  • Stable water level
  • Plant room clean, dry, accessible
  • Safety: steps, edges, non-slip surrounds

Garden and outside

  • Landscaping as per contract
  • Watering and garden taps
  • Outdoor shower
  • Access to the septic tank

Furniture and equipment, if furnished

  • Each item of the inventory: planned and found
  • Condition: new, damaged, missing
  • Linen, tableware, cutlery, utensils
  • Photos of each furnished room

End of the visit

  • Meter readings noted
  • Keys, badges and remote controls counted
  • Snag list written: number, place, description, photo, deadline
  • Signed by you (or by Yalin with your written power of attorney), the developer and Yalin
  • Sent to you and to the developer the same day

Snag clearance visit, within 60 days

  • Each item checked: cleared or not cleared
  • Before and after photos
  • List of remaining items sent to you and to the developer
  • Additional visit: 3,500 THB

Compliance with the plans, included

In every handover we compare the villa with the architect's plans filed for the permit: dimensions, positions, openings, networks. Significant and visible gaps only. Not a surveyor's measurement, not an architect's opinion.

Handover prices

Unfurnished9,000 → 14,000 THB
Furnished (furniture only)10,500 → 16,500 THB
Furnished and equipped (tableware, cutlery, linen, appliances)12,500 → 20,000 THB

1 bedroom → 4 bedrooms. Includes the check of compliance with the permit plans (significant, visible gaps) and 1 return visit within 60 days. Travel extra in the blue and yellow zones. Included in Premium.

Launch offer: handover at -50% with any Follow plan signed before 31 December 2026 (already included in Premium).

Still under construction? The End of build pack

For Essential and Follow clients: choice of finishes, electrical and plumbing checks with videos before the walls close, handover and snag clearance. Up to 25% less than one by one. To order before plastering.

From 22,000 THB